PO Box 1439, Denver NC 28037

704-483-2144

Shoreline Pricing

Item

Example

Description

Prices Starting At

Permit: Riprap

Permits for Duke Power, Army Corps and DWQ as required

$450

Permit: Seawall

Permits for Duke Power, Army Corps and DWQ as required

$800

RipRap: Large Bolder

18″ plus Quarried Stone

$125/ton of $12.50 per sq ft

RipRap: Round River Rock

6″-18″ River Rock

$150/ton or $15 per sq ft

Rip Rap: Standard

6″-18″ Quarried Stone

$110/ton or $11 per sq ft

Sea Wall: Treated Wood

Treated Pine Wood 6×6 6×6 2×8

$21/sq ft

Sea Wall: Standard

8″ Interlocking

$25/sq ft

Sea Wall: Interlocking Block

6″ Colonial Designer

$28/sq ft

Seawall Redi-Rock

2ft x 2ft x 4ft Redi-Rock block

$45/sq ft

Paver Patio

2×4 4×4 4×6 standard pattern

$13/sq ft

Grading

Grading, clearing and back fill along shoreline

$75/hr